Request for Multifamily and Residential Development

Use the below form to request new multi-family service
  1. This form requires you to submit a site map in PDF format. The site map should show preferred ground-level service and meter location, along with a detailed drawing of switchgear and electrical room specifications, if applicable.

    1. No file chosen

      (Example site plan.)

    Applicant Information

  2. Billing Information:

  3. Contact Information: (same as billing)

  4. Multi-Family Information:

  5. Connected Load

    Customer Load Load Type Value

  6. Cost of design changes because of inadequate or inaccurate information will be the responsibility of the property owner or electrician. Load data forms without plans may be delayed or not processed. Site grading, utility and landscaping plans are required to complete PGE electrical design.

  7. PGE asks that all construction materials be cleared from temporary location before crews install the temporary service.

  8. By clicking submit, I agree to the terms and conditions of PGE construction service requirements.

    I also understand that data submitted via this form will be transmitted by email and will not be encrypted until it is entered into the PGE system.

  9. Download a pdf version of this form